Renewable-powered infrastructure for the AI era +44 74 1289 9703|

Compute follows power. We build both.

Trustvolt Energy Group develops infrastructure projects across Europe in which renewable generation, grid connection, storage and AI data centres are planned as one asset — on sites that already have a history of carrying heavy load.

Schematic of a renewable-powered data centre campus Wind turbines and solar rows feed a substation and battery storage, which in turn supply a data hall. Generation Grid & storage Compute
The Trustvolt model: generation, grid and storage, and compute developed on one site, under one plan.

Three parts of one project

Most data-centre projects in Europe fail on power, not on demand. We start with the power.

Renewable generation

Wind, solar and hybrid parks developed or acquired to supply a campus directly, with the surplus sold to the grid. Physical supply first, certificates second.

Grid and storage

Secured grid connections, private-wire arrangements and battery storage that turn a variable resource into firm capacity a data-hall operator can sign for.

AI data centres

Sites designed for high-density compute from the outset: liquid cooling, heat reuse and expansion in stages, leased to operators and hyperscalers on long-term contracts.

Why the name

Trust is the foundation of infrastructure that lasts: the trust of investors who commit capital for a decade, the trust of communities that allow a campus on their land, and the trust of operators who sign long-term contracts for power they have not yet seen built. Volt is the unit of the energy those commitments deliver. Together they describe what we build — infrastructure grounded in lasting relationships and the purpose of delivering power to where it is needed most.

Europe is full of places that once carried industry: power-station sites, steelworks, mines, rail yards. They have what a modern data centre needs most and can least easily get — a heavy grid connection, cooling water, land zoned for industry and a community used to it. We bring those sites back into service, rooted in the grid capacity that already exists.

About Trustvolt Energy Group

A site with a grid connection is worth more than a site with a plan for one.
  • FocusRenewable generation · Grid · AI data centres
  • GeographyEurope
  • RoleDeveloper and long-term owner
  • Pipeline640 MW across 5 projects
  • Head officeLondon, United Kingdom

How a project comes together

Four stages, in this order. We do not start a data hall before the power behind it is secured.

  1. Site and grid

    Identify a site with existing or achievable grid capacity, secure the land and the connection agreement.

  2. Generation and storage

    Develop or contract wind and solar supply, size storage, and close the gap between variable supply and firm demand.

  3. Tenant and financing

    Pre-let capacity to an operator or hyperscaler, then raise construction financing against the contracted cash flow.

  4. Build and operate

    Construction in stages with fixed-price contractors; long-term ownership and operation, with heat and surplus power sold locally.

355 MW
Grid capacity secured or in advanced negotiation
5
Projects in development across 4 European countries
480 MW
Renewable generation in the portfolio and pipeline
2028
First campus scheduled to energise

Figures as at 30 June 2026. Pipeline figures describe projects under development and are not a forecast of what will be built.

Investors

Trustvolt Energy Group invests through a closed-ended vehicle open to professional and semi-professional investors. Fund documents, the pipeline overview and the data room are available after a first conversation.

Read about the fund

Landowners, municipalities, utilities, operators

If you own a former industrial site, run a grid or a utility, or need contracted, renewable-powered capacity for compute, we would like to hear from you early — before a plan is fixed.

Work with us